Click on image to view larger version.


Figure 1


Fig. 1. (a) Local relief along a 300-m toposequence, (b) soil water content (0–20 cm), and (c) soil profile water content (0–90 cm) on 30 June, 25 July, and 2 September. Plot locations are identified numerically on the relief diagram (a). Soil water content was determined 5-m downhill from the plot location.