
Fig. 2 Crop temperature measured with an infrared thermometer as a function of distance along Transect 5 for one date before and for three dates after a 46-mm rain on 12 June 1993. The NoA site (Site 11) noted was never observed to be stressed, though final yields were quite low relative to norms